proHNS conducted public outreach and designed roadway and utility improvements to Misty Lane, a 320-foot stub street dead-ending in a cul-de-sac in North Douglas’ Bayview subdivision. During the project’s construction, proHNS provided construction administration and inspection services on behalf of the client. Design elements included:

  1. A full water system reconstruction with new 10” HDPE water main line, 1” poly water services with new valve boxes, and a new fire hydrant.
  2. Removal and replacement of the existing sewer lift station, and installation of new sewer service cleanouts.
  3. Removal of existing asphalt pavement and road base, placement of 9.5” of new 2” minus shot rock capped with D-1, and placement of 2.5” of new asphalt pavement.
  4. Replacement of CMP culverts with CPP culverts correctly sized for drainage flows and rerouting of the drainage network into existing drainage easements.